Projects

Mock Construction Scheduling Project

Team Member

  • Used Primavera P6 to create a Work Breakdown Structure, network diagram, and Critical Path Method Schedule for a simulated academic building construction under a Design-Bid-Build construction method

  • Used EMV analysis to select subcontractors based on profit, scheduling, and various risks in quality, safety, etc

  • Accounted for weather and climate restrictions, subcontractor availability, overhead responsibilities, and more to create a realistic critical path for the construction process

Mock Construction Scheduling Project WBS
Mock Construction Scheduling Project 2.jpg

Multifamily Unit Specification Master Spreadsheet

Project Leader

  • Worked with project managers and on-site superintendents to create a printable template in Microsoft Excel containing information on appliances, hardware, square and linear footage, etc

  • Utilized variety of Excel formulas, data labels, cell value linking, etc to make future changes and usability streamlined and simple

Master Specification Sheet 1
Master Specification Sheet 2

Interactive Qualifying Project

Team Member

  • Worked with the Borough of Hounslow in London, England to analyze themes in their community's perceptions of the local COVID-19 response

  • Compiled an interactive and comprehensive timeline of both the national UK response and the local borough's initiatives

  • Conducted surveys within the Hounslow community on perceived resource accessibility and restriction effectiveness

  • Presented findings and recommendations for future action in both a comprehensive report and an in-depth presentation to local officials

IQP Cover Page
IQP Final Presentation
bottom of page